The Great Hall Project

Client Brief:

To work as a specialist sub-contractor on behalf of Open Contracts, our work involved carrying out the all mechanical works as per the original written tender issued by the M&E Consultants.

The Accurate Response:

After carrying out our initial site survey and reviewing the tender documentation we set out our proposed scope of works which was issued to the client for approval. A full design was carried out to correctly spec the comfort cooling requirements, this then enabled us to recommend the following solutions:

We supplied and installed the following equipment:

21 x Daikin FXDQ40A Slim ducted fan coil units
2 x Daikin BS16Q14AV1 16 way BS Boxes
2 x Daikin REYQ14T condensing units
1 x DCC601A51 Tablet controller
1 x Z380C Tablet controller screen
1 x Tablet controller 3G router

New swirl supply and return grilles will installed within the ceiling of the internal office space. A crane lift was required to lift the two Daikin condensers safely into place onto the 1st floor roof space of the building. A full commissioning program was put in place and a customer demonstration was provided to the client on handover of the newly installed equipment. As part of our works Accurate also carried out a validation and commissioning of the existing toilet extracts.