Nutmeg House

Client Brief:

The client brief was to install a series of air conditioning units that needed to be situated within the bulkhead of the office floor in this commercial premises in London

The Accurate Response:

After carrying out a site survey and taking into account what we had previous installed in the 4th floor of this building, we decided the system that would fit the brief best would be a Mitsubishi electric system using ducted units within a Bulkheads built within the refurbished office area.

Below are a small selection of photographs taken during the various stages of the Install.